Browse our most popular models. If you're looking for other options, you can download the brochures below or schedule a free consultation today.
Browse product brochures
Looking for even more options? Give us a call and let us find the best fit for you, or view brochures for Bradford, Kingsbrook, and more from Silvercrest Homes, our manufacturing partner.
A Prefab Home arrives in pre-assembled sections that are installed on a permanent foundation. Because so much of the work occurs under controlled conditions, on-site delays are kept to a minimum. As a result, these modular homes can be built in as little as 12 weeks time.
An Accessory Dwelling Unit (ADU) is a secondary dwelling with a fully-appointed living space. In contrast to on-site ADU construction which can drag on for months, prefab ADUs only take about five weeks to build and install.